Vol. 12/ Núm. 4 2025 pág. 3659
https://doi.org/10.69639/arandu.v12i4.1895

Quality
Improvement in Interlining Manufacturing Through
the
Six Sigma DMAIC Methodology: A Case Study
Mejora de la calidad en la fabricación de entretelas mediante la metodología Six Sigma
DMAIC: un estudio de caso

Alan Badillo Ruiz

ba454431@uaeh.edu.mx

https://orcid.org/0009-0000-6062-0568

Universidad Autónoma del Estado de Hidalgo

Instituto de Ciencias Básicas e Ingeniería

Área Académica de Ingeniería y Arquitectura Hidalgo

México

Erick Uriel Morales Cruz

erick_morales@uaeh.edu.mx

https://orcid.org/0009-0008-2071-9713

Universidad Autónoma del Estado de Hidalgo

Instituto de Ciencias Básicas e Ingeniería

Área Académica de Ingeniería y Arquitectura Hidalgo

México

Katherin Paola Martínez Olvera

ma453760@uaeh.edu.mx

https://orcid.org/0009-0005-6526-6031

Universidad Autónoma del Estado de Hidalgo

Instituto de Ciencias Básicas e Ingeniería

Área Académica de Ingeniería y Arquitectura Hidalgo

México

Estella María Esparza Zúñiga

estella_esparza@uaeh.edu.mx

https://orcid.org/0009-0008-2603-1311

Universidad Autónoma del Estado de Hidalgo

Instituto de Ciencias Básicas e Ingeniería

Área Académica de Ingeniería y Arquitectura Hidalgo

México

Eusebio Ortiz Zarco

ramiro_cadena@uaeh.edu.mx

https://orcid.org/0000-0003-4745-6198

Universidad Autónoma del Estado de Hidalgo

Instituto de Ciencias Económico Administrativas

Área Académica de Administración Hidalgo

México

Artículo recibido: 10 noviembre 2025 -Aceptado para publicación: 18 diciembre 2025

Conflictos de intereses: Ninguno que declarar.
Vol. 12/ Núm. 4 2025 pág. 3660
ABSTRACT

The
Six Sigma DMAIC (Define, Measure, Analyze, Improve, and Control) methodology is
widely
used for quality improvement in manufacturing processes. This study presents a case study
focused
on improving quality in an interlining manufacturing process within a textile company.
The
objective was to identify the most frequent defects, analyze their root causes, and implement
corrective
and preventive actions to increase the process sigma level. Quality tools such as
inspection
sheets, Pareto analysis, p control charts, Ishikawa diagrams, and a PDCA-based action
plan
were applied. The results showed that stains, creases, and tears accounted for approximately
80%
of total defects. After implementing improvement actions, sigma levels increased across all
defect
categories, with improvements of up to 0.6 in some cases. Although the target sigma level
was
not achieved for all defects within a single cycle, the findings demonstrate the effectiveness
of
DMAIC as a structured approach for quality improvement in interlining manufacturing and
highlight
the importance of continuous improvement strategies.
Keywords:
DMAIC, six sigma, PDCA, quality, continuous improvement, Ishikawa
RESUMEN

La metodología Six Sigma DMAIC (Definir, Medir, Analizar, Mejorar y Controlar) es
ampliamente utilizada para la mejora de la calidad en los procesos de manufactura. Este estudio
presenta un caso de estudio enfocado en la mejora de la calidad en un proceso de fabricación de
entretelas dentro de una empresa textil. El objetivo fue identificar los defectos más frecuentes,
analizar sus causas raíz e implementar acciones correctivas y preventivas para incrementar el
nivel sigma del proceso. Se aplicaron herramientas de calidad como hojas de inspección, análisis
de Pareto, gráficos de control p, diagramas de Ishikawa y un plan de acción basado en el ciclo
PDCA. Los resultados mostraron que las manchas, arrugas y desgarres representaron
aproximadamente el 80 % del total de defectos. Tras la implementación de acciones de mejora,
los niveles sigma aumentaron en todas las categorías de defectos, con mejoras de hasta 0,6 en
algunos casos. Aunque el nivel sigma objetivo no se alcanzó para todos los defectos en un solo
ciclo, los hallazgos demuestran la eficacia del DMAIC como un enfoque estructurado para la
mejora de la calidad en la fabricación de entretelas y destacan la importancia de las estrategias de
mejora continua.

Palabras clave: DMAIC, Six Sigma, PDCA, calidad, mejora continua, Ishikawa

Todo el contenido de la Revista Científica Internacional Arandu UTIC publicado en este sitio está disponible bajo
licencia Creative Commons Atribution 4.0 International.
Vol. 12/ Núm. 4 2025 pág. 3661
INTRODUCTION

In
the manufacturing sector, quality is considered a strategic indicator and one of the most
crucial
elements, as it directly impacts customer satisfaction, cost reduction, and market
competitiveness
(Evans, 2011). In the textile industry, ensuring product quality is essential,
especially
for intermediate products such as interlinings, which play a fundamental role in
garment
construction by providing structure, durability, and aesthetic appearance (Hayajneh,
2013).
Any deviation in their quality may lead to rework, waste, and loss of customer confidence.
The
Six Sigma methodology has been widely promoted and adopted by world-class
manufacturing
organizations due to its proven advantages in reducing waste, improving process
efficiency,
and eliminating activities that do not add value to the process (Rifqi, 2021; Ahmed,
2019;
Smith, 2011). Its successful application relies on the correct identification of critical
problems,
the prioritization of improvement areas, and the implementation of structured actions
aimed
at minimizing defects, errors, and variability while maximizing organizational profitability
(Coronado,
2002).
Among
the different Six Sigma approaches, the DMAIC model (Define, Measure, Analyze,
Improve,
and Control) provides a systematic framework for problem-solving based on data-driven
decision
-making. This model enables a clear definition of the problem, the selection of
appropriate
measurement tools, an in-depth analysis of process performance, the implementation
of
improvement actions, and the establishment of control mechanisms to ensure long-term
sustainability
(Chavez, 2025; Lynch, 2003; Monday, 2022).
Although
literature reports numerous applications of DMAIC in textile and manufacturing
processes,
most studies focus on final garment production or large-scale operations. Limited
research
has specifically addressed the application of DMAIC in interlining manufacturing
processes,
despite their critical role in garment quality. Therefore, this research aims to apply the
DMAIC
Six Sigma methodology to improve quality in an interlining manufacturing process,
identifying
the most frequent defects, analyzing their root causes, and proposing corrective and
preventive
actions to increase the process sigma level and ensure compliance with customer
requirements.

It
is important to highlight that a series of limitations may be presented by the application
of
DMAIC, mainly because each of the phases must be used with the lean thinking philosophy.
Likewise,
once the methodology is applied in an initial stage, a continuous improvement program
that
uses the PDCA model (Plan, Do, Check, Act) is to be designed by management, thus allowing
of
success of the improvement actions to be monitored and changes to be proposed based on the
variations
that are undergone by the process over time (De Mast, 2012; Mandal, 2012).
Vol. 12/ Núm. 4 2025 pág. 3662
DMAIC
Cycle
Within
the continuous improvement of six sigma projects, the acronym DMAIC has been widely
employed
in conjunction with the PDCA cycle (Sokovic, 2010; Sin, 2015). Each of the letters
that
make up the DMAIC has a particular objective and is served as the basis for the following
phase
as shown below
Define: Identify the need for change and the benefits from it.
Measure: Quantify the actual state of the system by diagnostic and root causes
Analyze: Compare the state of the system with the “ideal” state and determine corrective
and
preventive actions
Improve: Follow the actions and measure the results.
Control: Continue with the successful actions and modify what is needed.
Define

The
objective of this stage is to verify the actions necessary to resolve problems that are
considered
critical for the organization and are directly related to the organization's available
resources.
A strategic vision must be established, with a focus on external factors that generate
costs
for the organization. This allows for the establishment of containment, correction, and
prevention
actions, and internal cost problems can subsequently be resolved (Rahman, 2018).
Measure

In this stage, all available information on the process to be studied is gathered by the
organization, with a particular focus on information that will allow for a better understanding of
how stakeholders' expectations are being met. Statistical tools are often utilized, as well as core
tools such as failure mode and effect analysis (FMEA). Special care must be taken to include and
select information in an appropriate format that is to be presented to management so that
permanent containment actions can be established (Basios, 2017).

Analyze

In the analysis stage, different tools and methods are typically employed based on risk-
based analysis. Clear evidence must be presented for the interpretation of the results obtained in
the previous phase. For Sigma projects, the process capability is defined at the Sigma level,
which will serve as a performance indicator so that, once the improvement plan actions (PDCA)
have been implemented, the degree of impact of the Six Sigma project on the organization can
be measured (Beyene, 2016).

Improve

Considered the most important stage of the Six Sigma methodology, the carrying out of all
the management and execution actions necessary to improve the organization's functions,
financial aspects, and customer requirements is deemed important (Kurnıa, 2021). It is suggested
that the root causes of the problems must be resolved by the improvement plan (Nedra, 2019).
Vol. 12/ Núm. 4 2025 pág. 3663
Control

The
effectiveness of the measures established in the improvement plan is sought to be
monitored
by the control phase while the future state of the system is simultaneously monitored
(avoiding
the repetition of the same waste). The final stage of the original DMAIC cycle is
represented
by it, but at the same time, a guideline is served by it to ensure that the organization's
objectives
and goals are not deviated from (Adnan, 2010).
Literature
review
The
literature has widely reported the application of lean thinking and Six Sigma tools,
from
the service industry to manufacturing and processing.
The
six-sigma methodology has been successfully applied in foundry projects, with a focus
on
customer complaints, an increase in process capability, a reduction in the defect rate, and a
reduction
in customer complaints (Kumar, 2007).
Six
-sigma methodology has been successfully implemented in the design of a fixture that
would
reduce warp during the heating process of a heat treatment, achieving a new die design that
not
only eliminates costs due to rework but also increases the efficiency of the process, presenting
significant
savings (Kumar. 2009; Hernandez, 2025).
DMAIC
applications are not limited to large companies with complex processes where
based
on an Ishikawa, the main causes of defects were clearly identified by a CNC machining
company
(Hiregoudar, 2011), leading to a reduction in manufacturing costs, an improvement in
the
process, and the development of a training plan, as well as the implementation of a 5'S model
in
small and medium-sized companies in India. It is worth noting that an increase in productivity
in
medium-sized companies has been through the application of continuous improvement tools
such
as the 5'S (Hernandez, 2025).
Researchers
have emphasized the importance of integrating 4.0 technologies with the
DMAIC
methodology for automated processes, where Machine Learning (ML) technology serves
as
a tool to predict the weight of components based on prior statistical information, allowing for
the
prediction and control of the amount of scrap generated in the process, as well as more precise
control
of parameters (Martinez, 2025; Krauß, 2023).
Case
Study: Background
This
research project began with a meeting between the project team, senior management,
and
production managers to analyze the main problems related to the interlining manufacturing
process.
During the meeting, current procedures were reviewed, and a preliminary diagnosis of
production
conditions was conducted. As a result, several common nonconformities were
identified
that directly affect the quality of the final product, including stains, tears, and wrinkles
in
the interlinings.
Vol. 12/ Núm. 4 2025 pág. 3664
These
defects not only increase costs through rework and waste but also affect customer
perception
and compromise product functionality. The team prioritized a detailed analysis of the
causes
of these problems and proposed corrective and preventive actions to improve process
efficiency
and ensure compliance with quality standards. Management expressed its willingness
to
collaborate with the necessary resources, and key project stakeholders took specific
responsibilities,
committing to work under a continuous improvement approach aligned with the
Six
Sigma methodology.
Unlike
previous studies, this research focuses on interlining manufacturing, a scarcely
documented
textile sub-process which increases novelty due to main authors emphasizing the use
of
lean tools in mostly automotive and aerospace industry. The objective of this research is to
improve
the sigma level of the interlining manufacturing process through the DMAIC
methodology.

Interlinings,
as intermediate products used primarily in the manufacture of collars, cuffs,
and
hems, must have specific technical standards met, such as strength, adhesiveness, and
uniformity.
The final appearance of garments and their functionality can be compromised by the
presence
of defects such as stains, creases, or tears, generating rework, waste, and loss of customer
confidence
(Montgomery, 2020).
METHODOLOGY

The
first stage involved directly observing the production process, which included the
warping,
gumming, weaving, dyeing, and napping stages. The team used verification sheets to
record
the number and type of defects they identified in the interlinings produced during several
work
shifts. The researchers randomly selected production batches for the sample to ensure
representative
data.
For
data analysis, we used an inspection sheet to record and classify the most frequently
observed
defects (stains, creases, tears, etc.). Using an attribute control chart (p-chart), we
evaluated
the proportion of defective products in 10 different batches, corresponding to 5
workdays
with two shifts per day. We selected a batch size of 100 items by simple random
sampling.

The
team then organized and analyzed the information using a Pareto chart to visualize
which
defects accounted for the highest proportion of nonconformities. Following the 80/20
principle,
they also determined the process's sigma level based on each defect. Once they
quantified
the defects, they used an Ishikawa diagram to identify their root causes, classifying
them
into categories such as materials, methods, machinery, labor, and environment, and
ultimately
establishing an action plan.
Vol. 12/ Núm. 4 2025 pág. 3665
RESULTS AND DISCUSSION

Project Charter (Define)

The
results obtained in this study demonstrate that the application of the DMAIC Six Sigma
methodology
is an effective approach for identifying, prioritizing, and reducing defects in the
interlining
manufacturing process. The analysis of 1,000 linear meters of interlinings revealed a
defect
rate of 10%, which is considerably higher than the scrap levels of approximately 5%
reported
in similar textile processes (Jiménez-Delgado, 2023; Mughal, 2021; González, 2023)
This
finding justified the need for a structured improvement project.
In
the kick-off meeting of this six-sigma project, the team established a Project charter that
defined
and delimited the object of study. This tool serves as the basis for defining any
improvement
project. (Prashar, 2014; Srivastava, 2021) present the information corresponding to
the
definition phase in table 1.
Table 1

DMAIC Project Charter

Project title
Minimize defects in interlinings.
Business Case
A considerable number of errors were
found
during the fabric production
process.
A representative sample of
1,000
meters of interlinings was used
to
quantify these to establish an
approximate
production batch.
Goal
Increase the process sigma level to 4.5
for
each defect.
Metrics

(CTQ´s)

Primary
Metric (sigma level)
Cost
of quality ($)
Project Scope
Management, project team,
production
department.
Checklist
(Measure)
During
the analysis carried out at the plant, the team inspected 10 production batches
corresponding
to one week of work, with a total of 1,000 linear meters of interlining inspected.
The
sample size was selected based on industrial inspection standards and resource availability,
ensuring
representativeness while minimizing production disruption. The team recorded the
defects
found in Table 2 using the verification sheet.
Vol. 12/ Núm. 4 2025 pág. 3666
Table 2

Interlining presented defects

Defect type
Frequency
Stains
37
Creases
25
Tears
18
Lack of
adhesiveness

10

Textile pollution
7
Frays
3
Total
100
The
table 2 clearly shows that most defects corresponded to stains, folds, and breaks with
37,
25, and 18 defects respectively, while the lack of adhesiveness occurred a total of 10 times;
finally,
the exposure of textile contamination and fraying ranked as the least observed defects, so
clear
evidence exists of what type of defects the present improvement project should focus on.
Researchers
have reported scrap levels of 5% in the literature for different stages of a textile
process
(Jiménez-Delgado, 2023) so that when they observe a total of 100 defects in 1000 meters
of
interlinings, they find that the value of 10% is considerably high compared to what other
improvement
projects have reported (Mughal, 2021; González, 2023).
Sigma
Level (Measure)
Sigma
level was calculated based on DPMO using standard Six Sigma conversion tables.
According
to what is shown in Table 2, the defects and their frequency were quantified based on
the
representative sample, and the sigma level of the process was also determined. As shown in
Table
2, the sigma level for defects was reported as 3.3, 3.5, 3.6, 3.8, 3.7 and 4.3 for stains, folds,
tears,
lack of adhesiveness, textile contamination and fraying respectively. The management goal
is
set at 4.5, with no value being recorded above the established goal.
Table
3
Sigma
Level of the Process
Defect type
Sigma Level Sigma Level
Goal

Stains
3.3 4.5
Tears
3.6 4.5
Lack of
adhesiveness

3.8
4.5
Textile pollution
3.7 4.5
Frays
4.3 4.5
Vol. 12/ Núm. 4 2025 pág. 3667
The
importance of using the sigma level of a process as a key performance indicator to
measure
the current state of the system and to be able to monitor the effect of improvement actions
on
process optimization was highlighted previously (Patel, 2023). For the present research, it is
stated
that the sigma level is at least above 3 for each of the defects, with which it is aimed that
this
level is increased by a maximum of 1.5.
Pareto
Diagram (Measure)
According
to optimize the organization´s time and resources the team created a Pareto
diagram
corresponding to all detected defects. It clearly shows that the three most common defects
are
strains, creases and tears, representing 80% of the total defects, complying with the 80/20
principle.
This indicates that by focusing on eliminating these three defects, the team could reduce
the
number of defects by 80%. The investigation did not prioritize three defects that accounted
for
20% due to their low percentages, which were individually 10%, 7%, and 3%. The Pareto
analysis
showed that stains, creases, and tears accounted for approximately 80% of total defects,
confirming
the applicability of the 80/20 principle in this process. Similar patterns have been
reported
in previous textile related Six Sigma studies, where a small number of defect types were
responsible
for most nonconformities (Kumar. 2009; Hiregoudar, 2011), By focusing
improvement
efforts on these critical defects, the project optimized the use of organizational
resources
and maximized the potential impact of corrective actions.
Figure
1
Pareto
Chart of Defects
Control
Chart-P (Measure)
The
use of p control charts allowed for the identification of abnormal variability in two
production
batches, indicating the presence of special causes affecting process stability. This
result
is consistent with findings reported by other researchers, who highlight the effectiveness of
attribute
control charts in detecting process instability within Six Sigma projects [18]. The
identification
of out-of-control points provided valuable information for directing root cause
Vol. 12/ Núm. 4 2025 pág. 3668
analysis
efforts. As shown in figure 2, which corresponds to a p control chart, we can see the
proportion
of defective units per production batch. Each point corresponds to the percentage of
defects
found in a batch of 100 randomly inspected units. The center line (CL) shows the process
mean,
while the upper (UL) and lower (UL) lines represent the statistically calculated control
limits.

Based
on the p chart, two batches out of 10 (20%) are out of control; batches 3 and 7 are
above
the LCL, 0.14 and 0.12 respectively, indicating abnormal variability at those points in the
process.
The goal is to verify whether this system’s behavior is due to a special cause. A
preliminary
analysis suggests that the causes could be machine failures or human error, which
should
be investigated to prevent recurrences. Researchers have reported that using attribute
control
charts in Six Sigma projects is effective for measuring and, if that approach fails, taking
process
control measures (Evans, 2011; Hayajneh, 2013; Rifqi, 2021; Ahmed, 2019; Smith,
2011).

Figure
2
Initial
Control Chart-P of defects
Ishikawa
diagram (Analyze)
Root
cause analysis using the Ishikawa diagram revealed that the main sources of defects
were
related to materials, methods, machinery, and personnel. In particular, inconsistent raw
material
quality, inadequate cleaning procedures, insufficient training, and poor environmental
conditions
were identified as critical contributors to staining defects. These results align with
previous
studies in textile manufacturing, which emphasize the influence of material handling,
equipment
cleanliness, and operator training on product quality (Nedra, 2019; Kumar, 2007).
Figure
3 shows the Ishikawa diagram, developed to analyze the root causes of the most common
defect:
staining. Possible causes were identified, grouped into six classic categories: materials,
methods,
labor, machinery, environment, and measurement.
Vol. 12/ Núm. 4 2025 pág. 3669
In
the materials category, inconsistent quality in polyester batches and oil residue on the
reels
were considered; in the methods category, lack of cleaning between batches and improper
adjustment
of drying times; in the labor category, lack of training in the handling of the gumming
system;
in the machinery category, rollers with accumulated residue were detected; in the methods
category,
poor cleaning between batches; in the environment category, excess moisture in the
gumming
area; and in the measurement category, the lack of standardized controls during
inspection
(Kurma, 2021).
Figure
3
Fishbone
Diagram
Action
Plan (Improve)
For
the action plan, management, along with those responsible for the project and
production,
developed a series of recommendations based on containment, correction, and
prevention
actions. Table 4 mentions these actions.
Table
4
Improvement
actions for the problems detected
#
Problem Action
1
Measure: Lack of
standardized
visual
controls

Management,
in conjunction with the production department, will
develop
a series of visual aids and controls to assist workers in their
daily
tasks. They will constantly monitor the system's status to make
improvements
if necessary.
2
Material: Inconsistent
quality
on polyester
batches

The
team developed a procedure that details the quality
characteristics
that the material must meet.
Vol. 12/ Núm. 4 2025 pág. 3670
3
Material: Oil residue on
reels

To
eliminate dirt caused by oils and/or residues, an awareness
campaign
on industrial hygiene was carried out.
4
Personnel: Poor machine
cleaning
training
The
maintenance department, in conjunction with quality, developed
training
in autonomous maintenance.
5
Personnel: Frequent staff
turnover

The
future plan proposes that the HR department conduct an analysis
of
the reasons for high staff turnover.
6
Environment: High
humidity
in the gumming
area

Researchers
will conduct a subsequent study to establish corrective
actions.

7
Methods: Improperly set
drying
times
The
methods department conducted a study to determine the ideal
drying
time.
8
Methods: Lack of
cleaning
between batches
Maintenance
and Production established a cleaning procedure as part
of
autonomous maintenance.
9
Machines: Rollers with
accumulated
residue
As
with cause number 8, both problems were corrected by the
cleaning
procedure.
1
0

Machines: Leaking steam
valves

A
preventive maintenance plan was developed to address this
situation.

Control
Chart-P (Control)
Once
the improvement actions were implemented, a P control chart was created again to
monitor
the system status, as shown in Figure 4. The process variation was decreased because of
the
implementation of the improvement actions. P charts have been successfully used to measure
process
variation and to have a detailed control of the control of changes in a process (Jimenez,
2023;
Patel, 2023),
Figure
4
Improve
Control Chart-P of defects
Vol. 12/ Núm. 4 2025 pág. 3671
Sigma
Level (Control)
As
a result of the implementation of improvement actions, the process sigma level index
was
increased from 3.3, 3.5, 3.6, 3.8, 3.7, and 4.3 to 3.5, 3.7, 3.9, 4.0, 4.2, and 4.5, respectively.
Increases
in quality and productivity in various areas have been led to by the implementation of
DMAIC,
resulting in the sigma level of the processes being increased.
Table
4
Sigma
Level of the Process
Defect type
Sigma level
before

Sigma level
after

Stains
3.3 3.5
Creases
3.5 3.7
Tears
3.6 3.9
Lack of
adhesiveness

3.8
4.0
Textile
pollution

3.7
4.2
After
implementing the proposed corrective and preventive actions, improvements were
observed
in the sigma levels of all defect categories. The sigma level increased by up to 0.6 in
some
cases, demonstrating the positive impact of the DMAIC methodology on process
performance.
However, the target sigma level of 4.5 was achieved only for one defect type (frays),
indicating
that while significant progress was made, further improvement cycles are required.
Similar
limitations have been reported in other DMAIC-based case studies, where incremental
improvements
are achieved through successive PDCA cycles rather than a single intervention
(
Krauß , 2023; Patel, 2023). Overall, the results confirm that integrating DMAIC with continuous
monitoring
tools such as PDCA and control charts provides a robust framework for quality
improvement
in textile manufacturing processes, particularly in intermediate products such as
interlinings.

Although
the DMAIC methodology proved effective in reducing defect rates and
increasing
sigma levels, the results indicate that achieving the target sigma level for all defect
categories
within a single improvement cycle is challenging in interlining manufacturing
processes.
Defects associated with raw material variability and environmental conditions showed
slower
improvement rates, suggesting the need for sustained corrective actions and stronger
process
controls. These findings emphasize that DMAIC should be complemented with
continuous
improvement mechanisms such as PDCA cycles, preventive maintenance programs,
and
operator training to ensure long-term process stability. Therefore, quality improvement in
Vol. 12/ Núm. 4 2025 pág. 3672
intermediate
textile processes should be approached as an iterative and systematic effort rather
than
a one-time intervention.
CONCLUSIONS

This
study applied the DMAIC Six Sigma methodology to improve quality in an interlining
manufacturing
process, enabling the systematic identification, analysis, and reduction of the most
frequent
defects affecting the final product. Through the use of statistical and quality tools, critical
defects
were prioritized, and their root causes were identified, allowing for the development of
targeted
corrective and preventive actions.
The
implementation of the improvement actions led to a measurable increase in the process
sigma
level for all defect categories. Although the target sigma level of 4.5 was achieved only for
one
defect type, the overall improvement demonstrates the effectiveness of the DMAIC
methodology
as a structured approach for quality improvement in textile manufacturing
processes.

It
is important to emphasize that continuous monitoring of the implemented actions is
required
to ensure their long-term effectiveness. The integration of DMAIC with the PDCA cycle
provides
a continuous improvement framework that allows organizations to evaluate
performance,
detect deviations, and implement additional corrective actions as needed.
Future
research should focus on conducting successive PDCA cycles to further increase
the
sigma level of the remaining defects, as well as on integrating advanced tools such as digital
monitoring
systems or Industry 4.0 technologies to enhance process control and predictive
capabilities
in interlining manufacturing.
Acknowledgements

The
authors A.B.R. and K.P.M.O. would like to thank Mtro. Luis Ricardo Martínez
Pacheco
for his teachings, wisdom, and patience. They also extend their gratitude to the interlining
company
that opened its doors for the development of this work and the collection of information.
Vol. 12/ Núm. 4 2025 pág. 3673
REFERENCE

Adnan
Abid, M., & Anees, M. (2010). How to minimize the defects rate of final product in textile
plant
by the implementation of DMAIC tool of Six Sigma.
Ahmed,
S. (2019). Integrating DMAIC approach of Lean Six Sigma and theory of constraints
toward
quality improvement in healthcare. Reviews on environmental health, 34(4), 427-
434.

Basios,
A., & Loucopoulos, P. (2017, July). Six sigma DMAIC enhanced with capability
modelling.
In 2017 IEEE 19th Conference on Business Informatics (CBI) (Vol. 2, pp. 55-
62).
IEEE.
Beyene,
H. T. (2016). Minimization of defects in sewing section at Garment and Textile Factories
through
DMAIC methodology of Six Sigma (Case: MAA Garment and Textile Factory).
Mekelle
University.
Coronado, R. B., & Antony, J. (2002).
Critical success factors for the successful implementation
of
six sigma projects in organisations. The TQM magazine, 14(2), 92-99.
Chávez, O. A. E., Ramírez, O. A. A., Cruz, E. U. M., Barranco, C. A., Pacheco, L. R. M., & Vite,
A. J. (2025). Modelo Integrado de 5S y Clasificación ABC para la Mejora Continua en la
Gestión de Inventarios de una Farmacia Comunitaria: Modelo Integrado de 5S y
Clasificación ABC para la Mejora Continua en la Gestión de Inventarios de una Farmacia
Comunitaria. RCMOS-Revista Científica Multidisciplinar O Saber, 1(2).

De Mast, J., & Lokkerbol, J. (2012).
An analysis of the Six Sigma DMAIC method from the
perspective
of problem solving. International Journal of Production Economics, 139(2),
604
-614.
Evans,
J. R., & Lindsay, W. M. (2011). Administraciòn y Control de la Calidad (Sèptima Ediciòn
ed.). Mèxico: Cengage Learning .

González, R. G., León, S. J., Ortega, C. G., & Parra, D. B. (2023). Método de mejora para
incrementar la productividad en la industria maquiladora del vestido en base a la
herramienta PHVA, DMAIC, Lean y Six sigma. LATAM Revista Latinoamericana de
Ciencias Sociales y Humanidades, 4(1), 2181-2202.

Hayajneh, M. T., Bataineh, O. M. A. R., & Al-Tawil, R. A. M. I. (2013).
Applying Six Sigma
Methodology
based on “DMAIC” tools to reduce production defects in textile
manufacturing.
Recent advances in industrial and manufacturing technologies, 1(1), 19-24.
Hernández,
E. Z., Cruz, E. U. M., Fuentes, G. E. A., Anaya, M. R., & Quintanilla, L. R. (2025).
Implementación de S para incrementar la productividad en una empresa de bolsas
plásticas. Ciencia Latina Revista Científica Multidisciplinar, 9(2), 3457-3476.

Hernandez, K. U. R., Vazquez, J. A. H., Cruz, E. U. M., & Hernandez, D. F. (2025). La
Metodología 8D Como Herramienta para la Mejora Continua y Reduccíon de Productos
no Conformes en la Industria de Zapatos de Seguridad: The 8D Methodology as a Tool for
Vol. 12/ Núm. 4 2025 pág. 3674
Continuous Improvement and Reduction of Non-Conforming Products in the Safety
Footwear Industry. RCMOS-Revista Científica Multidisciplinar O Saber, 1(2).

Jiménez-Delgado, G., Quintero-Ariza, I., Romero-Gómez, J., Montero-Bula, C., Rojas-Castro,
E., Santos, G., ...
& Campis-Freyle, L. (2023, July). Implementation of Lean Six Sigma to
improve
the quality and productivity in textile sector: a case study. In International
conference
on human-computer interaction (pp. 395-412). Cham: Springer Nature
Switzerland.

Krauß,
J., & Borchardt, I. (2023). Prediction and control of injection molded part weight using
machine
learningA literature review. Procedia CIRP, 118, 867-872.
Kurnıa, H., Jaqın, C., Purba, H. H., & Setıawan, I. (2021).
Implementation of Six Sigma in the
DMAIC
Approach for Quality Improvement in the Knitting Socks Industry. Tekstil ve
Mühendis,
28(124), 269-278.
Lynch,
D. P., Bertolino, S., & Cloutier, E. (2003). How to scope DMAIC projects. Quality
progress,
36(1), 37-41.
M.
Kumar, F. Jiju Antony, C.N. Madu, Winning customer loyalty in an automotive company
through
six Sigma: a case study. Qual. Reliab. Eng. Int. 23(7), 849866 (2007).
https://doi.org/10.1002/
qre.840.
Mandal,
P. (2012). Improving process improvement: executing the analyze and improve phases
of
DMAIC better. International Journal of Lean Six Sigma, 3(3), 231-250.
Martínez,
A. D. S., Hernández, J. A. O., Cruz, E. U. M., Zúñiga, E. M. E., & Hernández, D. F.
(2025).
Optimization of Distribution Processes in Logistic Environments Using Six Sigma
DMAIC
and Warehouse 4.0. Revista Veritas de Difusão Científica, 6(3), 1577-1601.
Monday,
L. M. (2022). Define, measure, analyze, improve, control (DMAIC) methodology as a
roadmap
in quality improvement. Global journal on quality and safety in healthcare, 5(2),
44.

Montgomery,
D. C. (2020). Introduction to statistical quality control. John wiley & sons.
Mughal,
U. K., Khan, M. A., Kumar, P., & Kumar, S. (2021, June). Identification and analysis of
stitching
defects at the stitching unit: a case study. In Proceedings of the International
Conference
on Industrial Engineering and Operations Management (pp. 373-384).
N.L.
Hiregoudar, B. Soragaon, On some aspects of developing an effective model for the
implementation
of six Sigma concept in small and medium-sized manufacturing enterprises
in
India. Int. J. Manage. Sci. Eng. Manage. 6(1), 4248 (2011). https://doi.org
/10.1080/17509653.2011.10671145

Nedra,
A., Néjib, S., Yassine, C., & Morched, C. (2019). A new lean Six Sigma hybrid method
based
on the combination of PDCA and the DMAIC to improve process performance:
Application
to clothing SME. Industria Textila, 70(5), 447-456.
Vol. 12/ Núm. 4 2025 pág. 3675
Patel,
M. T., & Desai, D. (2023). Implementation of Six Sigma in the small-scale ceramic industry
and
its holistic assessment. International Journal of Quality Engineering and Technology,
9(2),
110-144.
Prashar,
A. (2014). Adoption of Six Sigma DMAIC to reduce cost of poor quality. International
Journal
of Productivity and Performance Management, 63(1), 103-126.
Rahman,
A., Shaju, S. U. C., Sarkar, S. K., Hashem, M. Z., Hasan, S. K., & Islam, U. (2018).
Application
of six sigma using define measure analyze improve control (DMAIC)
methodology
in garment sector. Independent Journal of Management & Production, 9(3),
810
-826.
Rifqi,
H., Zamma, A., Souda, S. B., & Hansali, M. (2021). Lean manufacturing implementation
through
DMAIC approach: A case study in the automotive industry. Quality Innovation
Prosperity,
25(2), 54-77.
S.
Kumar, M. Sosnoski, Using DMAIC six Sigma to systematically improve shopfloor production
quality
and costs. Int. J. Productivity Perform. Manage. 58(3), 254273 (2009).
https://doi.or
g/10.1108/17410400910938850.
Sin,
A. B., Zailani, S., Iranmanesh, M., & Ramayah, T. (2015). Structural equation modelling on
knowledge
creation in Six Sigma DMAIC project and its impact on organizational
performance.
International Journal of Production Economics, 168, 105-117.
Smith,
C., Wood, S., & Beauvais, B. (2011). Thinking lean: implementing DMAIC methods to
improve
efficiency within a cystic fibrosis clinic. The Journal for Healthcare Quality
(JHQ),
33(2), 37-46.
Sokovic,
M., Pavletic, D., & Pipan, K. K. (2010). Quality improvement methodologiesPDCA
cycle,
RADAR matrix, DMAIC and DFSS. Journal of achievements in materials and
manufacturing
engineering, 43(1), 476-483.
Srivastava,
P., Alrasheedi, M., Kaushik, P., & Sharma, S. (2021). Reducing the cost of poor
quality
and improving process output by adopting a Six Sigma DMAIC tool: a case study.
International Journal of Six Sigma and Competitive Advantage, 13(1-3), 195-216.